Showing posts with label blog. Show all posts
Showing posts with label blog. Show all posts

Monday, August 18, 2014

Nissan Leaf Test Ride

Green Living is the Life for Me





















Last week I did a test ride in the 2014 Nissan Leaf SL with Derek Parker of Leith Nissan in Apex, NC. What a great experience! Quiet, smooth, no gas or oil, and no emissions! Now that is green living!


During my visit, Derek discussed the pro's and con's of Leaf ownership and how many people purchase their Leaf as a second car and how it quickly becomes their primary car. Additionally, besides little to no upkeep, owners enjoy the savings of not having to pay for gas (charging the Leaf is estimated at about 1/4 the cost of a tank of gas currently).

On downside of ownership, the initial cost of investment can be rather steep (see cost below). The Nissan Leaf is not a sports car and it's range is limited to commuting less than 84 miles per charge and can vary depending on driving conditions and battery life. So the Leaf is not ready for long cross country trips or going faster than 90 miles an hour.


Cost
Currently, the cost of a Nissan Leaf ranges from $30,000 to $38,000. However, depending on your tax situation and your location you may be eligible for a $7500 tax deduction toward lease or purchase as well as additional state or local incentives. For more information, be sure to check out: http://www.pluginamerica.org/incentives


EPA Range Estimates for Nissan Leaf
2015 Leaf - 84 miles
2014 Leaf  - 83 miles
2013 Leaf - 75 miles
2012 Leaf - 73 miles
2011 Leaf - 73 miles

Cool Features

On this particular Leaf, there are four cameras that create a bird's eye view as you are parking or maneuvering in tight spaces. The cameras are mounted on front, rear and each side mirror to create this illusion.





















The shift for Reverse, Neutral and Drive settings is very similar to a mouse you would use for your computer.


There is very common sense layout of steering wheel and dash. The speedometer is right in line of driver's sight making it easy to know how fast you are going at all times.


Battery Life
The Leaf features Lithium-Ion battery packs that require an annual check up at a certified Leaf dealership. These types of batteries are known for their low maintenance, potential for higher capacities, expense to manufacture, and how they are affected by temperature fluctuations.

Every LEAF is covered by a New Vehicle Limited Warranty providing: 36-month/36,000-mile basic coverage (whichever occurs earlier); 60-month/60,000-mile powertrain and electric vehicle system coverage (whichever occurs earlier); and 96 months/100,000 miles Lithium-Ion Battery coverage (whichever occurs earlier).*

(*Nissan Leaf website)

Website Resources

Nissan Leaf Website

NC Clean Energy  Technology Center EV Info Page

EPA Green Vehicle Guide

Autobloggreen.com


***************
Other Views of Leaf

Plug in panel at front of car





















Rear storage including Bose Speaker and charge cord carry case


















View of drivers seat from passenger side


















*********************

Are you thinking about purchasing a Nissan Leaf or have more in depth questions? If so, my contact is Derek Parker at Leith Nissan in Cary, NC. His phone is 919-589-0029 and email is dparker@leithnissan.com  Be sure to mention you saw this blog post or #GreenLivingwithDerek.


*****************


Thanks for checking out my blog and clicking on my sponsors!

Rick
apexgardner@gmail.com
@apexgardner (Twitter)
http://apexlazydogblog.blogspot.com/




Sunday, August 3, 2014

Green Teams at Burt's Bees and Biltmore Estate


Green Living is the Life For Me!

Recently, I had the pleasure of attending a panel discussion at the NC Annual Sustainable Energy Conference on Green Teams that included presenters from Burt's Bees and the Biltmore Estate.  It was a great presentation and I came away with lots of great ideas that I wanted to share.

Burt's Bees 

















Burt's Bees wants to be known as "Nature's Champion". According to Paula Alexander from Burt's Bees, sustainability is part of everybody's job description. Some of the many successes Burt's Bees has accomplished through their green teams:

  • In 2011, they reached zero waste to landfill (anything not recycled or composted goes to trash burning power plant)
  • 99% of their products are natural
  • Carbon neutral on US operations
  • Sustainable packaging (including container recycling at many retail locations like Whole Foods)
  • Philanthropic Giving through the Greater Good Foundation
  • Pollinator Partnerships to create bee buffer zones and bee hive materials for beekeepers
  • Corporate goal to reduce water usage 10% by 2020
One of their ongoing efforts includes an annual "dumpster dive". This is a three day audit of trash, recyclables and organics to see how they are doing. Alexander suggests this is a great way for a company or organization to see how they are doing.


Biltmore Estate

















Vanessa King is the Sustainability Coordinator at Biltmore Estate. Some of the green team successes at Biltmore include:
  • Field to Table program
  • Bio-fuel production (they grow canola, press into oil and produce around 100 gallons a day)
  • Employees are co-creators of sustainable practice such as composting and recycling
  • Biltmore is part of the community's cultural identity and strives to make tourism sustainable
  • Philanthropy programs to help people in need, food and farming and preservation of cultural and natural resources
  • Waste Management of composting, biodegradable materials, and recycling
  • Occupancy sensors through out facilities to limit lighting when not needed
  • Solar field that produces 20% of estate's energy usage
  • Restaurant that is Green Restaurant Certified
  • Annual river clean up both up stream and down stream from Biltmore Estate

Websites / Resources






Conclusion

Green teams are a great way to help companies and organizations become more sustainable. They affect the triple bottom line: Economic, Social and Environmental as well as create team building situations and something everyone can be proud of.

********************
Thanks for checking out my blogs and clicking on my sponsors!

Rick
apexgardner@gmail.com
@apexgardner (Twitter)




Saturday, June 28, 2014

USGBC-NC Walk & Talk: RDU Terminal 1 Renovation


Green Living is the Life For Me!

Last week I had the pleasure of attending the US Green Building Council - North Carolina (USGBC-NC) chapter Walk & Talk. The event featured a short lecture by the design team that renovated the RDU Terminal 1 at the Raleigh-Durham International Airport. Afterward, we took a tour of the public spaces at Terminal 1 and checked out the renovations and sustainable features in person.


Presenters
Irvin Pearce, AIA - Principal with Clark Nexsen, Inc.
Doug Brinkley, FAIA, LEED Fellow - Principal with Clark Nexsen, Inc.
Chad Humphrey, Balfour Beatty

Background on Project

  • Terminal 1 was originally built in 1981. (Pearce was involved on the original project)
  • Budget was $42 million; changes were made during project adding more sustainability to project scope; final cost is estimated to be around $50 million; to give you perspective, Terminal 2 cost around $580 million
  • Grand opening date of renovated terminal was April 13, 2014
  • All tenants are now required to meet LEED standards
  • Jobsite was adjacent to operating Southwest terminal
  • This was a total renovation of existing terminal
Pearce shows picture of Terminal 1 prior to renovation

Goals and Learning Objectives for Design Team

  1. How use of insulated translucent exterior wall panels solved security, energy (both light and heat, and budget concerns)
  2. How use of innovative credits required tenants to comply with LEED requirements
  3. How use of 2" exterior metal panels with reticulating foam seals produce a well insulated building and keeps moisture out
  4. Daylight studies convinced owner to add operable shades and 70% reflect glass to reduce existing glare on east side of building

Sustainable Features

  • Utilized recycled materials
  • Incorporated public transportation location into design; Triangle Transit provides buses that connect airport with both Raleigh and Durham
  • Installed energy saving escalators that slow down during non-use
  • Utilized low emitting paint (all wall paint is zero VOC (volatile organic compounds))
  • Installed LEED compliant flooring
  • Utilized low emitting adhesives and sealants
  • Kalwall was used instead of windows which allowed reduced lighting loads, better insulation value and did not compromise security
  • Building re-use: 86% structural (slabs on grade, composite decks, structural roof deck)
  • Building re-use:28% exterior walls
  • Reskin of exteriors and walls saved energy from what was existing
Walk

Pearce answers questions about materials used in renovation
Kalwall
 
Pearce points out future ticketing / baggage areas for possible growth
Exterior public transportation and covered passenger drop off area
Checking out the public art on the way to security screening and departure gates
Security screening area
View inside departure gate area and new restaurant


Take Aways for Me

  • As Pearce pointed out, it's important to have lots of great collaborators on projects of this scale. Because of the nature of the project, many specialty consultants were brought in address things like baggage systems, security, sign systems, daylighting, elevators/escalators and electronic systems.
  • The exterior and insulation is one of the most important features of making sustainable buildings.
  • Kalwall is better insulation value than glass (Kalwall = R10 vs Glass = R2) and great resource for daylighting a building
  • I asked Pearce why they did not add solar panels, LED lighting and water collection systems to the project and he said that solar panels would cause reflection problems for pilots, and LED and water collection systems were cost prohibitive at the time, but they were discussed.
  • The public art takes the project to another level of cool (see below)
Public Art







The public art in Terminal 1 really adds to the welcoming feel this renovated building. It brings character, charm and life to space where thousands of people pass through on a daily basis.

The Wright Brothers airplane artwork was taken from the floor in original Terminal 1 and recycled into a piece of artwork in the renovated space. It is a reminder of the building's history as well as the history of North Carolina.

Websites and Resources

**********************************
Thanks for checking out my blog and clicking on my sponsors!
Rick
apexgardner@gmail.com
@apexgardner (Twitter)
http://apexlazydogblog.blogspot.com/

Saturday, May 24, 2014

Apex gets new EV Quick Charging Stations



Green Living is the Life For Me!

This past week I saw an article in the Southwest Wake News about Apex getting one of the first quick charging stations for electric vehicles as well as two additional charging stations. So I decided to go and check them out.


According to the article and the town's website, the new Eaton DC Quick Charger can power the Tesla, Nissan LEAF and the Mitsubishi i-MiEV to about 80 percent capacity in 20-30 minutes, depending on the battery size.

Eaton DC Quick Charger Station

Close up of instructions for Eaton Quick Charger
Close up of Quick Charger Plug In
The stations were paid for through a grant from NC State's Solar Center and Advanced Energy. This set of charging stations is being installed along with future units at Duke University in Durham, and North Hills Mall in Raleigh.

GE Dual Pedestal Charger

Close up of Instructions on Level 2 Charger

Close Up of Level 2 Charger Plug In
While I was there taking pictures, Juliet Hurley, a Nissan LEAF owner, stopped by to charge her vehicle on the quick charger while visiting her customers in the area. Hurley lives in Durham and said that because of the quick charging station she was able to drive her LEAF on that particular day visiting with clients all over the Triangle. 


Congratulations to the Town of Apex for receiving the grant to install these charging stations and being one of the few public quick charging stations in the region. Right now the charging stations are free, but the stations are equipped with credit card readers for the future.

******************

Websites





******************



Thanks for checking out my blog and clicking on my sponsors!

Rick
apexgardner@gmail.com
@apexgardner (Twitter)
http://apexlazydogblog.blogspot.com/